The city of Sandy Springs will begin Phase Two of its 2010 paving program in mid-April, according to city’s April newsletter. The following streets are scheduled to be paved:

• Ison Road (Roswell to Grogan’s Ferry roads)

• Hammond Drive (Mt. Vernon Highway to Sandy Springs Circle)

• Roberts Drive (Spalding Drive to the city limits)

• Windsor Parkway (Peachtree-Dunwoody Road to the city limits)

• Powers Ferry Road (Northside Drive to the city limits)

• Northland Drive (Windsor Parkway to Ga. 400)

• Spalding Stables subdivision

• Long Island Way

The city’s Department of Public Works also will be improving the following roads through the state’s Local Assistance Roads Program:

• Mabry Road (Spalding to Glenridge drives)

• Hightower Trail (Roswell Road to Dunwoody Place)

• Kenbrook Drive (from London Drive to the road’s northwest end)

• Wing Street

• Auden Trail

• Rivertrail Court

• Towergate Place

• Scott Valley Road

• West Northway Lane